玻璃钢管安装要求

厂家直销
厂家直销
厂家直销
4486
文章
0
评论
2020年9月16日12:21:44 评论 33
摘要

1、玻璃钢管道(FRP pipe)在安装(install)前应对设备(equipment)管口、预埋件、预留孔洞、钢构造等触及管道安装(install)的内容进

1、玻璃钢管道(FRP pipe)在安装(install)前应对设备(equipment)管口、预埋件、预留孔洞、钢构造等触及管道安装(install)的内容进行复核。
1. Before installation, the pipeline shall check the contents concerning the installation of the pipeline, such as the nozzle of the equipment, the embedded parts, the reserved holes and the steel structure.
2、管道的坡度应按图纸的要求进行调整,调整办法能够利用支座达到坡度要求,焊缝应设置在便于检验、观察的地方。
2. The gradient of the pipeline should be adjusted according to the requirements of the drawings. The adjusting method can use the support to meet the gradient requirements. The welding seam should be set in a place convenient for maintenance and observation.
3、与传动设备(equipment)连接(Connect)的管道,安装(install)前内部要处理(Handle)洁净,焊接固定管口一般(commonly)应远离设备(equipment),以免焊接发生应力对传动设备(equipment)安装(install)精度的影响。
3. The pipeline connected with the transmission equipment should be cleaned before installation, and the fixed pipe mouth should be far away from the equipment to avoid the influence of welding stress on the installation accuracy of the transmission equipment.
4、管道与机器连接(Connect)前,应避免强力相对,在自由状态下检查法兰的平行度和同轴度。
4. Before connecting the pipe with the machine, the relative strength should be prevented, and the flange's parallelism and coaxiality should be checked under the free state.
5、安全阀应垂直安装(install),在投入试运行时,要及时调校安全阀。安全阀的最终调校在系统长进行,开启和回座压力要契合设计文件的规定。
5, the safety valve should be installed vertically, and the safety valve should be adjusted in time for commissioning. The final adjustment of the safety valve is carried out on the system, and the opening and returning pressure must conform to the design documents.
6、阀门安装(install)前,按设计文件核对其型号,并按介质流向肯定其安装(install)方向。当阀门与管道以法兰或螺纹方式连接(Connect)时,阀门应在关闭状态下安装(install);如以焊接方式安装(install)时,阀门不得关闭。
6. Before installing the valve, check its model according to the design document and deter分钟e its installation direction according to the medium flow direction. When the valve and pipe are flanged or threaded, the valve shall be installed in a closed state; if installed in a welded way, the valve shall not be closed.
7、仪表元件的临时替换:一切仪表元件安装(install)时,均采用临时元件替换,等试压、冲刷、吹扫工作结束后,投料前再正式安装(install)。
7. Temporary substitution of instrument components: All instrument components are installed with temporary components, and are formally installed before feeding after pressure test, flushing and purging.
厂家专业生产玻璃钢化粪池,模压化粪池,SMC化粪池,生物化粪池,玻璃钢管道,玻璃钢电缆桥架,玻璃钢电缆支架,玻璃钢格栅,玻璃钢水箱,玻璃钢脱硫除尘器等各类玻璃钢产品,本公司生产的玻璃钢类产品价格优惠,品种齐全。欢迎新老客户前来洽谈合作!

weinxin
联系电话:133 1318 7699
添加客服微信获取详细资料及报价!
厂家直销
  • 本公司多年来一直从事玻璃钢化粪池,模压化粪池,SMC化粪池,生物化粪池,玻璃钢管道,玻璃钢电缆桥架,玻璃钢电缆支架,玻璃钢格栅,玻璃钢水箱,玻璃钢脱硫除尘器等各类玻璃钢产品的研究、制造,拥有大型玻璃钢生产设备,自动化缠绕,技术先进,严抓产品质量,产品畅销全国各地,深受用户的信赖和好评。厂家专业生产玻璃钢化粪池,模压化粪池,SMC化粪池,生物化粪池,玻璃钢管道,玻璃钢夹砂管,玻璃钢电缆桥架,玻璃钢电缆支架,玻璃钢格栅,玻璃钢水箱,玻璃钢脱硫塔,玻璃钢净化塔,玻璃钢储罐等各类玻璃钢产品,本公司以其雄厚的技术力量、精良的加工设备、齐全的检测手段,稳定可靠的产品质量,诚实规范的商业信用在广大客户中享有盛誉。本公司生产的玻璃钢类产品价格优惠,品种齐全。欢迎新老客户前来洽谈合作!
  • 转载请务必保留本文链接:http://blg.wuaigouwu.xyz/3060.html
匿名

发表评论

匿名网友 填写信息

:?: :razz: :sad: :evil: :!: :smile: :oops: :grin: :eek: :shock: :???: :cool: :lol: :mad: :twisted: :roll: :wink: :idea: :arrow: :neutral: :cry: :mrgreen: